The space of clean room and surround has to maintain certain differential pressure, and should press the production engineering to request to decide that maintaining positive differential pressure or negative pressure is bad, the differential pressure of of by rule different brackets clean room and not- clean zone should be bigger than to equal the differential pressure of 5 Pas, clean zone and outdoors to be no smaller than 10 Pas. 100000 stages have no dust workshop, main filtering>=the 5 um dust shot son, it sends air volume according to ventilate number generally at 15 times/H above
Design to construct clean turnkey plant generally according to as follows national specification request:
1."The clean turnkey plant designs specification" GB50073-2001 2."Clean room construction and acceptance check specification" JGJ71-90 3."Adopt warm ventilation and air conditioning to design specification" GB50019-2003 4."Ventilation and air condition engineering start construction mass acceptance check specification" GB50333-2002
Request at the same time: 1."The medicine industrial clean room designs specification" 2."The drugs produce a mass supervision specification" GMP |